Two grant routes, clearly explained
Towards an eligible air source heat pump for qualifying properties under the standard Boiler Upgrade Scheme route.
For qualifying off-gas-grid homes replacing an oil or LPG heating system, available until 31 March 2027.
Eligibility depends on the home and existing fuel
For the enhanced route, the property must meet the current off-gas-grid requirements and the heating system being replaced must use oil or LPG. The property must not be connected to a heat network, and new-build properties do not qualify for this enhanced route.
A capped or clamped gas meter can still mean a property is treated as mains-gas fuelled. Final eligibility is confirmed through the official Boiler Upgrade Scheme process, and support remains subject to the live scheme rules, property and technology eligibility, funding availability and Ofgem approval.
An installer-led route, managed from assessment to handover
SwiftHeat UK Group Ltd begins with the home: heat loss, emitters, hot-water demand, available space, electrical requirements and the proposed outdoor-unit location. We then explain the suitable system and grant route in plain English and coordinate the application through the appropriate MCS-certified installation process.
Once all eligibility checks are approved and your quotation is accepted, SwiftHeat UK Group Ltd installs, tests and commissions your new air source heat pump and provides a clear handover. We manage the entire process for a seamless integration into a cleaner, lower-carbon heating system for your home.
The right outcome depends on more than the outdoor unit. Our assessment considers the complete heating system so that equipment, emitters, controls and hot water work together as intended.



